The in-ceiling projector screen can help you to keep your space neat and clean. The electric projection screen rolls-down immediately after pushing the button on the remote. When your presentation will be over, then you have to push the button on the remote and the projection screen will roll up.
Simply, your projection screen will disappear in just a few after pressing the button on the remote and leaving no footprint.
Usually, the professionals help in installing the tab tensioned projector screen. It is so because special skills are required for the installation of the projection screen. If you want to do DIY, then you should read the tips which are described below:
Planning
When it comes to the installation of the projection screen such as ALR projector screen UK, then it is imperative to do planned execution to make this process simple and smooth. Thus, planning is a very important step.
With the help of proper planning, you can easily get to know how to install the screen and where to install it to make the most of it. Once you have selected the appropriate position for the projection screen, then you should start creating the technical drawings.
While creating the drawings, you should be sure that wiring, pipes, or any other load-bearing elements do not get disrupted. In addition to this, you should also make sure that installation bolts are of acceptable length. While installing the projection, you should ensure that the projection screen comes in parallel with ceiling joists.
Once you have planned the installation process, then various important steps need to follow are described in detail:
Step 1: Measure And Cut
You should take the appropriate measurement and cut the ceiling installation area. After that, you should consider using the structural technical drawings. With the help of these technical drawings and stud finder, you can easily determine the space between ceiling joists. You have to locate the position which can act as the perfect mounting spot.
After determining the space for installation, you should create a channel that matches the length of the projection screen’s casing. The width of the channel varies according to the model of the projection screen. Make sure that the casing fits appropriately.
Step 2: Drill Holes
You should do a test to determine whether your electric tensioned projection screens can appropriately fit inside the channel which you have created in the previous step. You should drill holes to hang the projection screen. You should take one pencil and run it through the tapped holes. It will help you to find out where to drill holes. You have to create two corresponding holes on both ends of the channels. These holes will alight with the mounting brackets available on the projection screen.
Step 3: Integrate Control Unit.
The tensioned projector screen is available with the external control box. This external box is responsible for receiving both types of signals IR signals and RF signals. You can mount this control box either on the wall or integrate it with installation channels that you have prepared into the ceiling of your building.
Step 4: Integrate With Power Source
The electric-powered projection screens need a power supply. You have to run the electric wire near the projection screen. You should call the electrician to execute this step efficiently.
Step 5: Tuck Wires and Control Unit.
Now, you have to fit the wires, control unit, and power connection inside the installation channel. It is very much important to execute this process efficiently so that they do not create any kind of obstruction in the projection screen. The control box is composed of the RF receiver and you have to place it in such a way that it does not affect its ability to receive RF signals.
Step 6: Secure the Screen
It is already explained that you have to align the holes with the end cap brackets available on the projection screen. You should use the hex bolts and tighten them with the help of a socket wrench. Make sure that you do not overdo the tightening of holes. You should tighten up the holes to the point where they will not firmly turn.
Step 7: Install End Flange Covers.
It is quite an easy step in the entire installation process. You should install the end flange cover in such a way that it covers the last visible portion of the channels where the projection screen is tucked.
Step 8: Perform Final Inspection.
Once you completed the installation of the pull-up tab tension projector screen, then it is time to perform the last step which is inspection. You should make sure that the projection screen is installed properly.